This process breaks up the existing hardcore down to an average depth of 150mm. Large lumps of brick and concrete are pulverised into smaller lumps using the crusher unit. The tracks are graded to falls to allow rainwater run-off and then the hardcore is reconsolidated. This is ideal for old farm tracks that have deteriorated, forestry roadways etc.
Please contact WBC with your requirements to discuss how WBC can help to rejeuvanate your old access tracks and roadways.